Skip to main content
VFACE
All articles

Cloud Services

FinOps in the First 90 Days of a Cloud Migration

By the VFACE team · 4 Sept 2026 · 5 min read

Cloud bills grow faster than the value they return unless cost control is part of delivery. A practical sequence for the first three months.

Why cost drifts

Lift-and-shift moves the cost, not the benefit. Idle resources, untagged accounts and over-provisioned instances quietly inflate the bill, and nobody owns the number.

Days 1 to 30: make spend visible

Enforce a tagging standard before the first workload lands, and give every team a showback report. Visibility changes behaviour faster than policy.

Days 31 to 60: right-size and commit

Use real utilisation data to right-size, then buy reserved or committed capacity for the stable baseline only. Leave burst workloads on demand.

Days 61 to 90: automate the guardrails

Budgets with alerts, scheduled shutdown of non-production environments and policy-as-code checks keep the gains. Review monthly, and tie savings back to the business case so the programme keeps its funding.

Working through this in your organisation?

Talk to the team behind our Cloud Services practice about what a practical first step looks like for you.